Owner: Morongo Band of Mission Indians
Location: Cabazon, CA
Completion Date: 05/09/2005
The construction of the Morongo Resort and Casino was a huge undertaking. Cattrac Construction was able to assist through site preparation, excavating and grading the 20 acre site for the casino and installing all wet utilities before concrete footings were poured.
Cattrac also supplied a crushing operation onsite which produced 10,000 tons of RipRap used to reinforce the gabion walls surrounding the facility.